Steeple in the shopReplacing All Souls Church Steeple

Raised July 22, 2008

The Team

Client: Delta Epsilon LLC, 21 Omega Drive. Brattleboro, VT

Builder: Bensonwood®, Walpole, NH

Designer: Chris Carbone, Bensonwood, Walpole, NH

Steeple on truckJob Captain: Dennis Marcom, Bensonwood, Walpole, NH

Project Manager: Tom Olsen, Bensonwood, Walpole, NH

Engineer: John Wathne, Structures North, Brattleboro, VT

Mason: Glenn Rosinski, Rosinski Masonry, Brattleboro, VT

Roofer: Perry Phoenix, Phoenix Roofing Co., LLC, Townsend, VT.

Lifting off of the truckFinial Manufacture: New England Copperworks, RI

Statistics

Height: 40 feet, not counting copper fininal

Frame weight: 6400 lbs

Shipping weight: 8600 lbs (includes frame and hemlock sheathing)

Total weight: 16,000 lbs, including slate roofing

Materials: Douglas Fir glulams, Center mast: locally-sourced locust, Sheathing: locally-sourced hemlock

Construction: Factory machining and assembly at Bensonwood's Walpole facility.

Setting the steeple verticalTimber Frame Piece Count: 65 structural members (not counting sheathing.

Prepping for the final pick

Lifting into place.